8681 CHERRY LANE
LAUREL, MD 20707
301-362-1003
24/7 CUSTOMER SUPPORT
Mon - Fri: 9:00 - 17:30
SEND A MESSAGE
LAUREL, MD 20707
24/7 CUSTOMER SUPPORT
SEND A MESSAGE
Renovating an older building can be a challenging task, but it’s often worth it in the end when you can bring a new life to a structure that might otherwise be forgotten. One key step in the renovation process is interior demolition, which involves removing old walls, floors, and fixtures to make way for the new design.
Apro Enterprise recently had the opportunity to work on an interior demolition project as part of a larger renovation effort. The building in question was a historic office building that was being converted into apartments, and interior demolition was necessary to create the new floor plans.
Before we could begin the demolition, we had to do some careful planning. This included identifying the scope of work, obtaining necessary permits, and coordinating with other contractors who would be working on the project. We also had to make sure that we had all of the necessary tools and equipment on hand, including sledgehammers, pry bars, and heavy-duty trash bags.
Once everything was in place, we were ready to begin the demolition. Our crew took great care to ensure the safety of everyone involved, as well as the structural integrity of the building. We started by removing all of the old drywall and plaster, taking care to label and bag any hazardous materials such as asbestos. We then moved on to the floors, carefully removing old carpeting and tile to reveal the original hardwood beneath. This was a particularly challenging task, as the floors had been covered up for many years and were in rough shape. It took a lot of elbow grease to get them looking presentable again, but the end result was well worth it.
One of the biggest challenges we faced during the demolition was the fact that the building was still occupied by tenants. We had to work around their schedules and ensure that the noise and dust from the demolition didn’t disrupt their daily lives too much. To do this, we set up temporary partitions and used industrial-strength vacuums to minimize the dust.
When the interior demolition was complete, we were left with a clean slate for the next phase of the renovation. The old walls and floors had been removed, and the building was ready for the new electrical and plumbing work that would bring it up to modern standards. It was a big job, but our team was up to the task and we were able to complete it on time and on budget
In the end, the interior demolition was a crucial step in the renovation process, and we were proud to be part of it. Apro Enterprise is dedicated to bringing new life to old buildings, and we look forward to many more challenging and rewarding projects in the future.
info@aproenterprises.com
301-362-1003
8681 Cherry Lane
Laurel, MD 20707
Apro Enterprises Inc. © 2023 All Rights Reserved