8681 CHERRY LANE
LAUREL, MD 20707
301-362-1003
24/7 CUSTOMER SUPPORT
Mon - Fri: 9:00 - 17:30
SEND A MESSAGE
LAUREL, MD 20707
24/7 CUSTOMER SUPPORT
SEND A MESSAGE
Demolition and asbestos removal are critical stages in the construction process that necessitate a high level of expertise and precision. We’ll look at the demolition and asbestos removal work done at the National Museum of American History (NMAH) building by Apro Enterprise, highlighting the difficulties encountered and the techniques used to overcome them.
The NMAH building is a historic structure located in Washington D.C., which was originally constructed in 1964. The building was in need of extensive renovation and expansion, which required the demolition of several existing structures and the removal of asbestos.
Asbestos is a mineral that was commonly used in construction in the past because of its fire-resistant properties. However, it is now known to cause serious health issues, including lung cancer, mesothelioma, and asbestosis. As such, it is crucial that asbestos be removed by trained professionals using proper safety protocols.
The first step in the demolition process at the NMAH was to survey the building to locate and identify any areas where asbestos was present. Once the asbestos-containing materials were identified, they were carefully removed by trained professionals using specialized equipment. This process is called asbestos abatement and is strictly regulated by state and federal laws. The asbestos was removed safely, under full safety protocols, and disposed of according to regulations.
Next, the demolition team carefully demolished the existing structures, ensuring that all debris was removed from the site and that the surrounding area was kept clean and safe. The team used heavy equipment, such as excavators and bulldozers, to take down the structures, and then used cranes to remove the debris from the site.
One of the biggest challenges faced during the demolition was ensuring that the integrity of the remaining structures was preserved. The team had to take great care not to damage any of the historic features of the building, such as the façade and the main entrance. Additionally, they had to pay close attention to safety, to prevent any accidents or injuries.
In conclusion, demolition and asbestos removal are two important steps in the construction process that require a high level of expertise and precision. The team at the National Museum of American History faced a number of challenges during the demolition and asbestos removal process, but through careful planning, the use of specialized equipment, and strict adherence to safety protocols, they were able to complete the job successfully. And ultimately, it helped to improve the historical building, preserving it for the next generation.
info@aproenterprises.com
301-362-1003
8681 Cherry Lane
Laurel, MD 20707
Apro Enterprises Inc. © 2023 All Rights Reserved